Similar Projects
East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Tree and Debris Removal and Removal and Replacement of Damaged Lateral Crossing Culverts
Post-Bid
Smithfield, NC 27577

Grading, Drainage and Guardrail
Results
NC

Headwall
Results
Goldsboro, NC 27530

East River Phase 2 Project
Post-Bid
Clayton, NC 27527

Headwall
Results
Goldsboro, NC 27530

Drainage Rehabilitation
Post-Bid
Princeton, NC 27569

Headwall
Term Contract
Results
Pikeville, NC 27863

Headwall
Results
Goldsboro, NC 27530

Headwall
Term Contract
Results
Fremont, NC 27830

Headwall - Twin Runs
Results
Pikeville, NC 27863

Headwall
Results
Princeton, NC 27569

Headwall
Term Contract
Results
Goldsboro, NC 27530

Headwall
Term Contract
Results
Mount Olive, NC 28365

Headwall - Twin Runs
Term Contract
Results
Kenly, NC 27542

Last Updated 01/10/2020 02:07 PM
Project Title

Equipment and Labor to Perform

Physical Address View project details and contacts
City, State (County) (Johnston, Wayne Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 SP Mobilization 5 EA 2 1605 Temporary Silt Fence 800 LF 3 1610 Stone for Erosion Control, Class A 300 Ton 4 1610 Stone for Erosion Control, Class B 300 Ton 5 1610 Sediment Control Stone 300 Ton 6 1615 Temporary Mulching 40 Acre 7 1620 Seed for Temporary Seeding 400 LB 8 1620 Fertilizer for Temporary Seeding 1 Ton 9 1622 Temporary Slope Drains 500 LF 10 1630 Silt Excavation 150 CY 11 1631 Matting For Erosion Control 750 SY 12 1632 ¼” Hardware Cloth 750 LF 13 1638 Stilling Basins 200 CY 14 SP Wattle 100 LF 15 SP Polyacrylamide (PAM) 5 LB 16 SP Seeding & Mulching (Conventional) 75 Acre 17 SP Seeding & Mulching (Hydro) 50 Acre 18 1660 Mowing 50 Acre 19 1661 Seed for Repair Seeding 800 LB 20 1661 Fertilizer for Repair Seeding 2 Ton 21 1662 Seed for Supplemental Seeding 200 LB 22 1665 Fertilizer Topdressing 3 Ton 23 SP Coir Fiber Mat 500 SY 24 SP Traffic Control (Temp. Lane Closure) 5 EA 25 SP Traffic Control (Temp. Shoulder Closure) 5 EA.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents