Similar Projects
Forest Lawn Creek Inflow Removal and Outfall
Infrastructure
Bidding
Omaha, NE 68139

Tim Ohrt Park, Access Road, Parking and Site Improvements
Infrastructure
Bidding
$500,000 est. value
Bennington, NE 68007

Richard Plautz Crane Viewing Site Trail Improvements
Infrastructure
Post-Bid
$320,000 est. value
Grand Island, NE

66th & Cedardale Sidewalk Improvements
Infrastructure
Post-Bid
Papillion, NE 68046

2021 Sidewalk and Ramp Rehabilitation
Infrastructure
Results
Lincoln, NE

2021 SE Priority Sidewalk Repair Project
Infrastructure
Results
Lincoln, NE

Beltline Trail, Phase 2 Papio-Missouri River Natural Resources District
Infrastructure
Bidding
$40,000 est. value
Omaha, NE 68111

Parking Ramp Maintenance and Repairs - 2021
Infrastructure
Post-Bid
Grand Island, NE 68801

2020 Downtown Sidewalk Repair Project
Infrastructure
Results
Lincoln, NE

Math Science Center of Innovative Learning (COIL) Building South Parking Lot Replacement
Infrastructure
Bidding
$300,000 est. value
Chadron, NE 69337

Omaha Beltline Trail - Phase 01
Infrastructure
Post-Bid
Omaha, NE

2021 NW Priority Sidewalk Repair
Infrastructure
Results
Lincoln, NE

Plattsmouth Housing Authority Exterior Site Upgrades - Cassco Arms Apartments
Infrastructure
Post-Bid
Plattsmouth, NE

Dewey Park Parking Lot Improvements - 2021
Infrastructure
Results
Omaha, NE 68105

Coventry Sidewalk Improvements
Infrastructure
Post-Bid
Omaha, NE

Last Updated 04/15/2022 02:28 PM
Project Title

Parking Lot Improvements 2021

Physical Address View project details and contacts
City, State (County) Ravenna, NE 68869   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the removal and replacement of six inch thick (6") concrete pavement for the main parking lot area south of the high school and grade school areas. This project consists of the removal of 6,846 sq ft of 6" concrete pavement, 3,693 sq ft of 4" concrete sidewalk and 6,720 sq ft of green space for the construction of new student drop off/ pick lanes and bus drop off/ loading zonesThe construction of a new student drop off/ pick up zone consisting of 5,395 sq ft of 6" concrete pavement and 1,724 sq ft of 4" concrete sidewalk. Pedestrian walkways with ADA ramps and striping along with break-away bollards will be included in this project. A new bus drop off/ pick up zone will be constructed as well and shall consist of 5,081 sf ft of 6" concrete pavement and 2,017 sq ft of 4" concrete sidewalk. Pedestrian walkways with ADA ramps and striping will be included in this project. An additional 6,722 sq ft of 6" concrete pavement will be added in the grassed median out in front of the school to add additional parking stalls for the facility.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents