Similar Projects
Last Updated | 10/19/2020 10:33 AM |
Project Title | Azalea Building Partial Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Marion, NC 28752 (McDowell County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $60,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove and dispose of the existing stone ballast and single-ply roof down to the polyisocyanurate insulation. 2. Perform a thermal moisture survey. 3. Replace wet insulation if needed. Provide unit price. See Proposal Form 4. Repair and detail all roof penetrations, edges, drains, and any damages. 5. Over the existing insulation, furnish and install a new white .060 TPO mechanically fastened roof system. The roof system should include all accessories required from the manufacturer to issue a 20-year roof service warranty. 6. Clean existing metal fascia. 7. Issue manufacturer’s 20-year labor and materials warranty. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |