Similar Projects
West Coast University
Renovation - 136,000 SF
Design
Richardson, TX 75080

UPD BE Building Renovations
Renovation
Post-Bid
Dallas, TX 75235

Daycare Renovation
Renovation - 19,835 SF
Post-Bid
Dallas, TX 75235

BP10.110 Development Office Expansion
Results
Dallas, TX

South Campus TRB Renovation
Renovation
Results
Dallas, TX 75390

Paul Quinn College
New Construction, Renovation - 56,600 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75241

Southern Methodist University Bridwell Library Phase II
Renovation - 46,700 SF
Construction
University Park, TX 75205

Cedar Valley Campus One Stop Shop Renovation
Renovation - 33,000 SF
Post-Bid
$4,004,000 est. value
Lancaster, TX

IT Closet Upgrade North Lake College
Renovation
Results
Irving, TX 75038

Southern Methodist University Perkins Chapel Phase II
New Construction - 7,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75205

Brookhaven College IT Closet Upgrade
Renovation
Results
Farmers Branch, TX 75244

North Lake College Construction Sciences Building
New Construction - 96,000 SF
Construction
$25,500,000 est. value
Coppell, TX 75019

Eastfield College IT Closet Upgrade
Renovation
Results
$5,858,055 est. value
Mesquite, TX 75150

Dallas Baptist University Student Housing Phase III
New Construction - 10,500 SF
Construction
$2,200,000 est. value
Dallas, TX 75211

Biomedical Engineering and Sciences Building
New Construction - 118,000 SF
Results
$57,490,216 est. value
Dallas, TX 75390

Reported 07/30/2021 02:34 PM
Project Title

Early College High School Student Space Atrium Addition

Physical Address View project details and contacts
City, State (County) Dallas, TX 75212   (Dallas County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $4,356,147
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Addition to existing building including new Cafeteria seating area and serving line (approx. 6,000 sf), new restrooms (approx. 800 sf), new entrance and canopy (approx. 200 sf) and new classroom (approx. 800 sf), new chiller and cooling tower and associated site-work.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents