Similar Projects
Remediation at Nadine Pump Station Rebid Abatement
Term Contract, Infrastructure
Bidding
$165,000 CJ est. value
Verona, PA 15147

Furnish and Install Emergency One-Touch Lockdown System
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Pittsburgh, PA 15212

Tulpehocken Area Junior Senior High School Asbestos Abatement
Term Contract, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Bernville, PA 19506

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Park System Exterior Wayfinding and Signage Design
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Doylestown, PA 18901

Asbestos Abatement - Reading School District Administration Building - 1st and 2nd Floors
Alteration
Post-Bid
Reading, PA 19601

Asbestos Abatement and Related Work
Alteration
Results
Pottstown, PA

Entrance Sign Replacements Seneca Valley Elementary Schools
Renovation
Sub-Bidding
$250,000 CJ est. value
Harmony, PA 16037

Asbestos Abatement and Related Work at the Sellersville Elementary School
Alteration
Post-Bid
Sellersville, PA 18960

Charles Boehm Middle School Abatement Project
Alteration
Results
Yardley, PA 19067

Salem Township Blight Property Demolitions
Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Berwick, PA 18603

Professional Lead-Based Paint Risk Assessment for the Manchester Neighborhood
Alteration
Post-Bid
Pittsburgh, PA 15289

Last Updated 03/24/2023 06:03 PM
Project Title

New Tailpipe Exhaust System Germantown Bus Depot

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19102   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $223,950 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The contract duration is (60) calendar days from the notice to proceed. The "Work includes but is not limited to: Vendor to be responsible for the removal and installation new tailpipe exhaust system. To include two external roof mounted exhaust fans and five retractable flexible hose simple drop connections. The vendor shall be responsible for all labor, equipment, and materials for the complete installation. All questions must be submitted by (Friday, 10 March 2023) by (4pm) to be guaranteed an answer. Any inquiries regarding this bid and any request for change, modification, or clarification of any aspect of these Contract Documents must be made in writing to SEPTA at least eight (7) calendar days prior to bid opening in order for consideration to be given by SEPTA to affect a change in the Contract Documents. Any inquiries regarding this bid must be directed to Kevin L Marshall, Contract Administrator of the Procurement, Supply Chain and DBE Division at kmarshall@septa.org. or (215) 580-7610. A change, modification, or clarification to the Contract Documents can only by affected by a written Addendum issued by SEPTA via our ePS. SEPTA retain the right to reject any and all bids, as determined to be in the best interest of SEPTA. Each bid submitted shall remain firm for at least ninety (90) days from the date of the Bid Opening and may not be withdrawn in whole or in part during that time. By submitting a bid, the bidder certifies that the bid price is held firm for that time and any extension thereof. SEPTA, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4, and Title 49,Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in regard to any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation, and will not be discriminated against on the grounds of race, sex, color, or national origin in consideration for an award. Contractor will be required to comply with all applicable Equal Employment Opportunity laws and regulations. All bidders will be required to certify compliance with Executive Order 12549 (ineligible contractors). Any contract issued as result of this solicitation is subject to a financial assistance contract between SEPTA and U.S. Department of Transportation.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents