Similar Projects
Tifft Nature Preserve Accessibility Trail
New Construction
Conception
Buffalo, NY 14203

Alexander Street Apartments
New Construction - 25,000 SF
Design
$177,300,000 est. value
Yonkers, NY 10701

Washington Avenue Apartments
New Construction, Demolition - 16,300 SF
Design
$80,000,000 est. value
Albany, NY

Site Work Improvements Blue Mountain Reservation
Renovation
Bidding
$2,500,000 to $3,200,000 est. value
Peekskill, NY

Infrastructure Rehabilitation - Phase 2 Playland Park
Renovation - 2,280 SF
Bidding
$30,000,000 to $33,000,000 est. value
Rye, NY 10580

Refurbishment of Garden Avenue Tennis Courts 4 and 5
Post-Bid
Bronxville, NY 10708

2015 CIP Phase 2 Tennis Courts
Post-Bid
North Tonawanda, NY 14120

Samuel S. Stratton Department of Veterans Affairs Medical Center Parking Garage, Albany, NY
New Construction
Results
$5,000,000 to $10,000,000 est. value
Albany, NY

Construction of Franny Reese Park Improvements
Results
Wappingers Falls, NY 12590

Martin Luther King Revitalization Phase 2
New Construction
Construction
$1,650,000 to $1,700,000 est. value
Troy, NY 12180

Albright-Knox Gundlach Art Museum AK360 Expansion
New Construction - 29,000 SF
Construction
$155,000,000 est. value
Buffalo, NY 14222

Admirals Cove Waterfront Development
New Construction - 2,100 SF
Pending Verification
Haverstraw, NY 10927

Casey Park Skate Park Design Build Project
Infrastructure
Bidding
$500,000 est. value
Auburn, NY

2020 Repairs to Athletic Court Facilities at Various Parks
Post-Bid
Orangetown, NY 10962

Uptown Campus Dutch Basketball Court Repair and Improvements
Results
Albany, NY 12222

Reported 07/01/2021 12:00 AM
Project Title

Softball Field Site Improvements and Safety Upgrades at SUNY Oneonta

Physical Address View project details and contacts
City, State (County) Oneonta, NY 13820   (Otsego County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The removal of the existing softball infield and outfield materials, one foul pole, a portion of the softball field fencing, temporarily moving the first base dugout for grading purposes, and a couple of old backstop systems; and installation of concrete curb and synthetic turf nailer system, a new infilled synthetic turf surface, a new drainage system to handle runoff from the softball field, a new French Drain to address runoff from the adjacent slope to the north, hdpe corrugated trapezoidal shaped swale system, sub-drainage system and dynamic stone base for the future synthetic turf field, install one new foul pole, re-setting the first base dugout, underground fiber communications conduits, new electrical conduit and services to the existing Press Box, galvanized chain link fencing for portions of the outfield and new bullpen areas, new wall padding for the inside of the chain link fence backstop, concrete pitching mounds for the playing field and bullpens, and new dugout guard rail systems. Bid Alternate #1 includes providing a portable pitching mound and a set of turf style bases for the campus to use during the little league summer camp program.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents