Similar Projects
Foothills Trail - East Puyallup Trail Head Expansion - 3240 - Pierce County
Infrastructure
Design
Tacoma, WA

West Side of Phillips Rd SW Sidewalk
Infrastructure
Post-Bid
Lakewood, WA

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Post-Bid
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Steilacoom Blvd SW: Weller to Phillips City Project
Infrastructure
Results
Lakewood, WA 98259

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,849,000,000 est. value
Tacoma, WA 98405

McKinley Elevator and ADA Ramps Project
New Construction, Infrastructure
Post-Bid
$800,000 est. value
Tacoma, WA 98404

WSU LID Frontage Improvements Phase 4B
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Puyallup, WA

Sidewalk Replacement Puyallup Tribal Lands
Infrastructure
Results
$150,000 est. value
Tacoma, WA

Sidewalk Replacement, Puyallup Tribal Land
Infrastructure
Results
$150,000 est. value
Tacoma, WA 98411

Toscanos Sinkhole Repair and Drainage
Infrastructure
Results
$550,000 to $650,000 est. value
Puyallup, WA

JBLM North Access Improvement
Infrastructure
Results
$12,000,000 est. value
Lakewood, WA

Parkland Brookdale Interceptor Phase 3
Infrastructure
Results
$7,500,000 to $9,500,000 est. value
Tacoma, WA

ADA Improvement Program
Infrastructure
Results
$242,000 est. value
Graham, Spanaway, WA 98445

160th Retrofit and Pervious Sidewalk
Infrastructure
Results
$390,000 to $450,000 est. value
Sumner, WA 98390

Reported 06/10/2022 12:00 AM
Project Title

Traffic Curb Improvements

Physical Address View project details and contacts
City, State (County) Bonney Lake, WA 98391   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Traffic Curb Improvements Project includes removing and discarding approximately 750 feet of existing c-curb along South Prairie Road and 200th Avenue Court East and installing approximately 757 feet of new Type 6 cement concrete extruded curb along South Prairie Road and 200th Avenue Court East. The scope also includes applying curb paint and performing temporary project traffic control during construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents