Similar Projects
Lumpkin County High School HVAC Renovations & Modifications Bid Packages 1-6
Post-Bid
Dahlonega, GA 30597

Uninterruptible Power Supply (UPS) and Inverter Maintenance Services
Post-Bid
Kennesaw, GA

Lighting Replacement at Liberty County High School
Results
Hinesville, GA 31313

H930--Atlanta Generator Maintenance & Repair
Results
Decatur, GA 30033

Furnish and Install Generator at JCCI
Post-Bid
Jefferson, GA 30549

Lighting Upgrades for Rabun County High School Fine Arts Auditorium
Results
Tiger, GA 30576

Electrical Repair Services
Alteration
Post-Bid
GA

Valdosta Water Treatment Plant Switchgear Replacement
Alteration
Results
Valdosta, GA 31605

Emergency Standby Generator Maintenance Services - Annual Contract
Term Contract
Post-Bid
Augusta, GA

Generator
Alteration
Results
GA

LED Lighting
Alteration
Post-Bid
Cleveland, GA

HCBOE High School PAC Lighting Upgrade
Alteration
Results
Mount Airy, GA 30563

Replace - Study - Add Generators at Facility 5, 701, 753, 805, 806, 827, 828, 955, 1001, 2012 2021, 2125, 2127, 2174, 2300 and 2313
Term Contract
Post-Bid
Marietta, GA 30067

Library North – Replace Building Switchgear
Alteration
Results
$215,000 est. value
Atlanta, GA 30303

Generator Maintenance
Alteration
Post-Bid
Forsyth, GA

Last Updated 01/06/2023 10:31 AM
Project Title

Interactive Panel and Installation for the New Cartersville Primary School

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

OVERVIEW OF PROJECT The Cartersville School System is seeking qualified bids from qualified organizations to purchase and install 75" Interactive Panels for the new Cartersville Primary School. Balance Box mounts and stands are needed forthis installation for Primary Age children. This is a new construction project that is slated to open August 2023. Approximate installation dates for this equipment will be April-May 2023. This date is subject to change depending on construction timeline. 110 total wall mount panels with balance box mounts connecting back to designated AV pathway in each location 5 total mobile stand, panels with balance box mounts Recordex and ClearTouch brand is preferred for interactive panels. Balance Box brand is preferred for mounts and stands. Include specification sheets for equipment if alternate brand is proposed.Vendor may include features/options with proposal but must not be a part of original pricing

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents