Project Title | Onsite Sewage System Installation Project |
Physical Address | View project details and contacts |
City, State (County) | Chesapeake, VA 23322 (Chesapeake City County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Onsite Sewage System Installation Project 2013 Centerville Turnpike S. Chesapeake, Virginia 23322 Scope of work: Cost for Line Item #1 (include total cost for items A-I) These are known factors. Vendors must invoice for actual cost incurred as described herein. A) Construct an onsite sewage system that meets the location and construction specifications of the Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq. and 12VAC5-613-10 et seq., the Regulations), and all other applicable state and local laws, regulations, and ordinances. B) Construct the above onsite sewage disposal system in compliance with the Chesapeake Health Department (CHD) Construction Permit 234-22-048 at 2013 Centerville Turnpike S. Chesapeake, Virginia 23322 in the location shown on the permit. The permit contains additional conditions, notes, and information needed to construct the onsite sewage system. C) To prevent sewage from continuing to back up into the home or property surface while waiting for the septic work to start the contents of the existing septic tank shall be pumped by a properly licensed sewer hauler 14 days from signature of the Notice to Proceed and every 21 days thereafter until one week prior to the installation of the system. If the permit requires work within or under the existing drainfield (as indicated in the Permit) the contents of the existing septic tank shall be pumped out every 48 hours for one week prior to the installation or repair of the onsite sewage system in order to dry out the drainfield D) As necessary, provide or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations, and the Virginia Uniform Statewide Building Code (VUSBC). This includes obtaining or assuring that the owner obtains all permits and inspections as may be required by the local building authority in compliance with the VUSBC. E) Abandon any unused component of the former onsite sewage system as specified by the CHD Construction Permit 234-22-048.The existing septic tank shall be pumped by a properly licensed sewage hauler, the tank crushed in place, lime placed over the crushed tank, and the tank hole filled with clean backfill material. F) Obtain a final installation inspection from the system designer, Jason Fulbright, Onsite Soil Evaluator, and assure that the onsite sewage system complies with the Regulations. G) Provide all required documentation to the CHD following completion of construction and obtain an Operation Permit for the onsite sewage system. H) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. I) Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A, B, or C Contractors License from DPOR, Alternative Sewage Disposal System Contracting (ADS) specialty from DPOR, Master Alternative Onsite Sewage System Installer license from DPOR, proof of insurance. Bidders contacted by VDH to provide any missing required documents, must provide the document within 2 business days or their bid will be considered non-responsive. Additional Services (If Needed) Bidder must contact VDH Project Manager listed on the Notice to Proceed for approval prior to any additional services performed. VDH will issue a change order for actual additional services rendered. The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: A. Additional materials B. Additional labor and equipment. Breakdown of Total Cost When responding to solicitation Bidders must attach a document listing breakdown of total cost for line item 1. Bidders must attach a separate breakdown of cost for additional services. Additional cost should not be included in line item 1 bid submission. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |