Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 Public Works Project
Results
Hyrum, UT 84319

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Last Updated 11/18/2020 12:07 PM
Project Title

Under Canvas Booster Pump Station

Physical Address View project details and contacts
City, State (County) Big Water, UT 84741   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a new 4" PVC pipeline and booster pump station intended to supply water from the existing Big Water Tank site to the location of a new glamping development. The new waterline will connect into an existing transmission line at the tank site, route into the pump house where it will temporarily convert to ductile iron pipe, then continue uphill through a solid rock alignment to the tie-in point for the development. The booster pump package will be provided by others and installed by contractor.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents