Similar Projects
Constructing the Resurfacing, Auxiliary Lanes, Ramp Improvements, Median Barrier Rail Installation, and Bridge Rail Retrofits (Partial Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe)
Infrastructure
Bidding
$11,015,030 to $13,462,815 est. value
Birmingham, AL

Constructing the Resurfacing, Auxiliary Lanes, Ramp Improvements, Median Barrier Rail Installation, and Bridge Rail Retrofits (Partial Grading, Drainage, Pavement, Traffic Signals, and Traffic Stripe)
Infrastructure
Bidding
$11,015,030 to $13,462,815 est. value
Birmingham, AL

Pedestrian Improvements along Main Street, Bell Street and City Hall
Post-Bid
$400,000 to $500,000 est. value
Gardendale, AL 35071

Fountain Heights ADA Ramp and Sidewalk Improvements
Post-Bid
Less than $252,368 est. value
Birmingham, AL 35203

Empire - AML Reclamation Project
Results
Irondale, AL

Parking Lot Fultondale High School
Results
Less than $949,900 est. value
Birmingham, AL

Year 1 Citywide Sidewalk Improvements
Post-Bid
Birmingham, AL

Constructing the Drainage Improvements (Grading, Drainage, Pavement, and Traffic Stripe)
Results
$542,757 to $663,370 est. value
Midfield, AL 35228

7th Ave South - Streetscape Project
Post-Bid
Birmingham, AL 35200

Mountain View Drive Sidewalk Improvements
Results
Less than $370,000 est. value
Hoover, AL 35216

Belview Heights Gateway
Infrastructure
Post-Bid
Birmingham, AL

Soil Erosion Control
Results
Birmingham, AL

BX Birmingham Xpress Bus Rapid Transit BRT - Site Amenities Package
Infrastructure
Post-Bid
Birmingham, AL

Constructing the Pedestrian and Streetscape Improvements (Grading, Drainage, Hardscaping, Sidewalk Installations, and Landscaping) Underneath the I-20/I-59 CBD Bridge in Birmingham
Results
$27,418,748 to $33,511,803 est. value
Birmingham, AL

Oxmoor Valley Community Center Parking Lot Expansion
Infrastructure
Post-Bid
Birmingham, AL 35211

Last Updated 09/15/2021 05:06 PM
Project Title

Mount Olive Road Sidewalk Project

Physical Address View project details and contacts
City, State (County) Gardendale, AL 35071   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of mobilization, traffic control, clearing and grubbing, erosion control, pavement removal, grading, installation of curb & gutter (±450LF), concrete sidewalks, accessible ramps, handrail, striping and stabilization along the east side of Mt. Olive Road. All excavation will be unclassified regardless of material composition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Examination and Preparation, Mobilization.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents