Similar Projects
2019 Large Diameter Water Main Improvements (Rising Main 3 and 4) Project
Bidding
Pittsburgh, PA

2019 Large Diameter Water Main Improvements Rising Mains 3 and 4 Rising Main 3
Infrastructure
Bidding
Pittsburgh, PA

2020 Small Diameter Water Main Replacement Contract A
Post-Bid
Pittsburgh, PA 15222

2020 Small Diameter Water Main Replacement Contract B
Post-Bid
PA

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Sewer System Pipe Bursting Repairs
Results
Less than $78,500 est. value
West Mifflin, PA 15122

Mckinney Road Waterline Replacement
Infrastructure
Bidding
Pittsburgh, PA 15220

Furnishing and Delivering Ductile Iron Pipe and Accessories
Post-Bid
Pittsburgh, PA

Pennsylvania Avenue Water Line Replacement
Results
Pittsburgh, PA

CIPP Rehabilitation of Portions of the Monongahela Subaqueous Interceptors
Infrastructure
Bidding
Pittsburgh, PA 15233

Outer Transmission Waterline Loop Project-Phase III
Post-Bid
Brackenridge, PA 15014

Silver Alley Waterline Project
Results
McKeesport, PA 15132

Private Water Main and Meter Vault Relocation - Allegheny Campus
Post-Bid
$150,000 to $200,000 est. value
Pittsburgh, PA 15233

Garden Terrace North - Rural Court East/West Waterline Replacement Project
Results
Less than $700,000 est. value
Churchill, PA

Fire Hydrants
Post-Bid
Sewickley, PA 15143

Last Updated 05/20/2021 11:34 AM
Project Title

Thomas and McPherson Green Infrastructure

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15222   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PWSA is requesting bids for installation of green infrastructure features along Thomas Blvd, McPherson Blvd, N. Dallas Ave., N. Linden Ave., and Starling Way as well as waterline and lead water service line replacement along McPherson Blvd and N. Linden Ave. Green infrastructure features to be installed include median underground storage (Thomas and McPherson Blvds), roadway underground storage (N. Dallas Ave.), parking lane permeable pavers (N. Linden Ave.), and green alleyway permeable pavers (Starling Way). Dimensions for each GSI feature are indicated on the plan drawings. Work includes installation of new catch basins, sewer manholes, and connecting piping as indicated on the plan drawings. Work includes resetting of fire hydrants along McPherson Blvd and connection of new service connections to the new waterline. Work also includes full restoration of construction areas, including restoration of roadways and curbs where saw cutting and/or pavement removal is required for construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents