Similar Projects
Wee Hollow Homes
New Construction
Design
Camp Verde, AZ 86322

Owner Occupied Housing Rehabilitation Program ADOH 304-21 Round 1 Collier Residence
Renovation
Bidding
Prescott Valley, AZ 86314

Housing Rehabilitation Projects
Post-Bid
Prescott, AZ

Rehabilitation of Two (2) Single-Family Housing Units
Post-Bid
Prescott Valley, AZ

Housing Rehabilitation Program (Mccoy Residence)
Renovation
Results
Prescott, AZ 86314

Housing Rehabilitation Projects
Results
Prescott Valley, AZ

Copperfield
New Construction
Construction
Prescott, AZ 86301

Jasper Housing Development Phase 1
New Construction
Construction
Prescott Valley, AZ 86314

Craftsman Court
New Construction
Pending Verification
Chino Valley, AZ

Prescott Charities Homes
New Construction
Pending Verification
Prescott Valley, AZ 86301

Bungalows On Village Way
New Construction - 1,111,032 SF
Post-Bid
Prescott Valley, AZ 86327

Housing Rehabilitation Program ADOH 303-20 Round 3 Ellenwood
Renovation
Results
Prescott Valley, AZ 86314

Jasper Housing Development Phase II
New Construction
Construction
Prescott Valley, AZ 86314

Housing Rehabilitation Program ADOH 303-20 Round 3 Stevens
Renovation
Results
Prescott Valley, AZ 86314

Antelope Park Residential
New Construction
Construction
Prescott Valley, AZ 86315

Last Updated 08/17/2020 06:36 PM
Project Title

Owner Occupied Housing Rehabilitation Program ADOH 301-19 Round 5 Michael

Physical Address View project details and contacts
City, State (County) Prescott Valley, AZ 86314   (Yavapai County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists primarily of the repair and rehabilitation of a manufactured home.The project will include,but is not limited to,the following:repair and upgrade of electrical, plumbing, mechanical, insulation,lead based paint abatement and/or removal, replacement of existing unit, and other related repairs for targeted residential units meeting all HUD requirements and local building codes.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents