Similar Projects
Last Updated | 12/15/2020 09:34 AM |
Project Title | 2020 Prospect Booster Station Piping Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Lebanon, NH 03766 (Grafton County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes design and construction of the suction and discharge headers in the Prospect Booster Pump Station. The intent of the Project is to replace the entire suction and discharged headers with flanged fittings. These replacements will extend from the mechanical fitting on the suction line to the mechanical fitting on the discharge line. This will include but may not be limited to all pipe Tee’s, elbows, fit tings and appurtenances shall be ductile iron. Pipe shall be cement lined ductile iron. A bid alternative of Schedule 80 PVC may also be considered by the City. The City reserves the right to select whichever alternative is in the best interest of the City.All materials shall meet AWWA Standards. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |