Similar Projects
Shelburne Road Mazda Addition
New Construction - 3,155 SF
Conception
$800,000 est. value
South Burlington, VT 05403

Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Residence Inn By Marriott / Burlington
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Burlington, VT 05401

Residence Inn By Marriott / Burlington
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Burlington, VT 05401

CY21 Crack-Sealing Program
Infrastructure
Post-Bid
Less than $100,000 est. value
Burlington, VT

EAFR Range 6-6 Improvements
Infrastructure
Post-Bid
Jericho, VT

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Founder's Hall Demolition, New Walkways, and Lawn Area
New Construction, Demolition
Construction
$715,000 est. value
Colchester, VT

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

Blakely Road Residential
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Colchester, VT 05446

Airport Parkway (Phase 1) - City of South Burlington
Infrastructure
Conception
$563,000 est. value
South Burlington, VT 05403

Winooski Avenue Apartment Building
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Burlington, VT 05401

Catch Basin Grate and Pavement Repair
Infrastructure
Post-Bid
South Burlington, VT 05403

CY21 Street Reconstruction Program
Results
Burlington, VT

Last Updated 10/11/2022 11:04 AM
Project Title

Goss Jeep Addition

Physical Address View project details and contacts
City, State (County) South Burlington, VT 05403   (Chittenden County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 10, 2022 the project is in planning stage and seeking site plan amendment approval from the City of South Burlington Development Review Board. A meeting is scheduled for October 18, 2022. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 3,890 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents