Similar Projects
Aeration Basin and Building Improvements
Results
Brewer, ME

New Wastewater Treatment Plant Administration Building
New Construction
Results
Less than $1,100,000 est. value
Old Orchard Beach, ME

2019 Dewatering Upgrade
Results
Augusta, ME 04330

WWTF Improvements SRF
Results
Less than $6,800,000 est. value
Kennebunk, ME

WWTF Rotating Biological Contactor System Equipment
Results
Gardiner, ME

Wastewater Treatment Facility Solids Handling Upgrades
Results
Less than $2,500,000 est. value
Presque Isle, ME 04401

Wastewater Treatment Facility and Pump Station Upgrades
Renovation
Results
Lincoln, ME

Wastewater Treatment Facility Improvements
Results
Less than $11,110,000 est. value
Camden, ME

WWTF Upgrades
Results
Less than $10,000,000 est. value
Presque Isle, ME 04769

Wastewater Treatment Facility Contract Superintendent
Post-Bid
Belfast, ME

Wastewater Treatment Plant Secondary Clarifier 2 Upgrade
Results
Biddeford, ME

Wastewater Treatment Facility Upgrade
Bidding
Fort Fairfield, ME

Aeration Train 2 Rehabilitation
Bidding
South Portland, ME

Last Updated 12/03/2020 11:36 AM
Project Title

Westbrook WWTF Aeration and Secondary Clarifier Upgrades

Physical Address View project details and contacts
City, State (County) Westbrook, ME 04092   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: Perform all site and selective demolition work, as well as other miscellaneous demolition work, as shown on the Drawings. Contractor shall also be responsible for project coordination, scheduling, and site/personnel safety. Furnish all labor, materials and equipment necessary to construct a Blower Building. Furnish all labor, materials and equipment necessary to install and place into operation a process air system, including, but not limited to, process air blowers, process air piping, diffusers, and ancillary equipment. Furnish all labor, materials and equipment necessary to install and place into operation a NRCY system, including, but not limited to, propeller pumps, piping and ancillary equipment. Furnish all labor, materials and equipment necessary to install and place into operation aeration tank mixers. Furnish all labor, materials and equipment necessary to install and place into operation secondary clarifier mechanisms, including, but not limited to, spiral scraper mechanism, extended scum trough, and RAS adapter. Furnish all labor, materials, equipment, and incidentals required to complete the work in it entirely, including all bonds, insurance, permits, mobilization, and associated clean up.

Details

Division 46 - Water and Wastewater Equipment, Clarifier Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents