Similar Projects
Last Updated | 03/18/2019 02:16 PM |
Project Title | Intracoastal Waterway Maintenance Dredging |
Physical Address | View project details and contacts |
City, State (County) | Flagler Beach, Riviera Beach, FL (Flagler, Palm Beach Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | State Agency - 09/10/18 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project generally entails dredging approximately 185,200 cubic yards of sandy sediment from Reach I of the ICWW in Flagler County, Florida. The ICWW maintenance dredging area extends from ICWW Cut F-2 STA 32+00 through ICWW Cut-F10 STA 12+52. This maintenance work will include excavation of the ICWW channel to target elevations of -14 feet (ft) mean lower low water (MLLW) (project depth of -12 feet and 2-foot allowable overdredge). Material shall be dredged via the use of either a mechanical or hydraulic dredge to remove all material (inclusive of all in-channel debris) feasible from the dredge template. All dredged material shall be offloaded at the 44-acre dredged material management area (DMMA) FL-3 located in Palm Coast, Florida. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |