Similar Projects
Last Updated | 05/03/2023 11:44 AM |
Project Title | New Child and Adolescent Psychiatric Facility/BHSC Project |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95128 (Santa Clara County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction Commenced, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $422,852,989 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New Construction of an approximately 207,300 square foot Behavioral Health Services Center comprised of a 66-bed acute psychiatric hospital for children, adolescents and adults, a 50-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility, associated support areas. Project will include a tunnel connection to the Receiving and Support Center, and a bridge connection to the Main Hospital. Includes the following increments which combined make up the new BHSC Project: Increment 1 - Foundation, Structural frame, and under slab utilities: deep foundations, concrete foundations, steel superstructure, gravity and lateral systems, proprietary BRB system, utility pathways under building slab, misc. steel, bridge & tower superstructure. Increment 2 - Building Envelope Site & Site Utilities: exterior walls (thermal envelope), stairs and elevators, landscape and irrigation, and sitework. Increment 3 - Interior Improvements: interior build-out for building, tunnel and bridge, mechanical, electrical, plumbing, low voltage, security, fire alarm, fire protection, equipment and furniture anchorage, nurse call, pneumatic tube system (installation per HCAI and local applicable codes). I Increment 4 - Not within scope. (For reference only. Performed under preceding project PS3 Parking Structure Demolition.) Increment 5 - Delegated Design scope for Building Services: rainscreen anchorage, emergency generator/enclosure, system design details, vertical distribution including riser, elevators/vertical transportation genset, facade/skin engineering. Increment 6 - Delegated Design Scope for Interior Overhead MEP Supports and Seismic Anchorage: seismic point-load analysis and seismic anchorage and bracing for utilities. Site Improvement Drawings. Add Alternate 1: Cost to complete construction project within 27 months from Notice to Proceed (Substantial completion to 720 calendar days and final completion 820 calendar days). County of Santa Clara project no. DEV21-2730G, 263-CP19008-2 Project Number: 263-CPI9008, 619076.D |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 207,300 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |