Similar Projects
Last Updated | 08/19/2022 09:37 AM |
Project Title | Caroline Street Development Walkway Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | New Bedford, MA 02740 (Bristol County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $625,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Caroline Street Development Walkway Replacement Project with a general location 26 Caroline Street 02740 in New Bedford, Massachusetts The Project consists of: installation of erosion control measures and tree protection; saw cutting of asphalt; removal and disposal of existing bituminous concrete and concrete walkways/areas; removal and disposal of trees; remove and relocate park benches; disposal of excavated material; installation of root barrier; preparing the walkway subgrade; material testing; protection of work; loam and seed areas; and construction of concrete walkways and ADA accessible ramps areas throughout the development. The construction cost is estimated to be $ 350,000.00 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |