Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

2 Bridge Replacements and Intersection Improvements
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Harrisonville, MO 64701

2 Bridge Replacements and Intersection Improvements
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Harrisonville, MO 64701

Whataburger
New Construction - 3,746 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Raymore, MO 64083

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Job Order Contracting for Pavement Repair
Infrastructure
Results
$50,000 to $100,000 est. value

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

Salt Dome Pad Replacement
Infrastructure
Bidding
$230,000 CJ est. value
Raymore, MO 64083

2021 Bond - Ninth Grade Center
New Construction
Post-Bid
Raymore, MO 64083

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Last Updated 05/12/2023 09:37 AM
Project Title

Whataburger - Harrisonville

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for ground-up construction of a new restaurant. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 3,305 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents