Similar Projects
Herman Apartments
New Construction
Conception
Nashville, TN 37208

Crossroads Campus
New Construction
Design
Nashville, TN 37208

Crossroads Campus
New Construction
Design
Nashville, TN 37208

Rex 2 Apartment Building
New Construction - 50,451 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Nashville, TN 37217

Matter Health 01002
Build-Out - 498 SF
Bidding
Nashville, TN 37138

Starbucks #8300
Renovation - 3,750 SF
Sub-Bidding
$500,000 to $1,000,000 CJ est. value
Nashville, TN 37203

Panda Express
Build-Out - 2,254 SF
Post-Bid
$600,000 est. value
Nashville, TN 37013

Walmart Supercenter #710-607 - CAPXREF-3
Renovation
Post-Bid
Hermitage, TN 37076

Walmart Supercenter #659-234 - BEAUTY FACELIFT
Renovation - 20,008 SF
Construction
$13,850 est. value
Nashville, TN 37209

Walmart Supercenter #688-244 - Csp
Renovation
Construction
$1,170,895 est. value
Nashville, TN 94577

909 Division Mixed Use Development
New Construction - 254,800 SF
Pending Verification
$10,000,000 CJ est. value
Nashville, TN 37203

One22One
New Construction - 380,229 SF
Pending Verification
$10,000,000 CJ est. value
Nashville, TN 37203

Nashville Airport Hilton
New Construction
Design
Nashville, TN 37214

Matter Health 01003
Build-Out
Bidding
Nashville, TN 37115

Kroger #550-08
Renovation
Post-Bid
Nashville, TN 37221

Last Updated 10/20/2021 01:44 PM
Project Title

Korean Veteran’s Boulevard Roundabout Mixed Use

Physical Address View project details and contacts
City, State (County) Nashville, TN 37243   (Davidson County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Food/Beverage Service, Hotel/Motel, Retail, Swimming Pool(s)
Contracting Method Bids by Invitation.
Project Status Design Development, Sitework Start Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

46-story tower includes a 242-key Ritz-Carlton Hotel & 165 luxury Residences, Grand Ballroom & meeting spaces, fitness facilities, hotel bar & outdoor pool deck. 32-story tower to include 185 rental units with a fitness center, pool

Details

1,200,000 SF - Retail, New Construction, 1,200,000 SF New Construction, 2 Buildings, 1 Apartments/Condominiums, New Construction, 1 Hotel/Motel, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents