Reported | 11/19/2021 12:00 AM |
Project Title | Ranchitos Lift Station |
Physical Address | View project details and contacts |
City, State (County) | Santa Ana Pueblo, NM (Sandoval County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Ranchitos Lift Station - AL-16-A34: Installation of Approximately 755 Linear Feet of 8-Inch PVC Sewer Main Extension and Approximately 4 Manholes. Construction of a New Lift Station, construction of a new check valve structure, installation of a 3-phase power line extension and electrical panel at lift station, and the installation of fencing around the new lift station. Installation of approximately 400 linear feet of 8-inch PVC water main extension and 8-inch gate valve and 8-inch fire hydrant, installation of approximately 312 linear feet of 1-inch PE water service line. Excavation, as used in these specifications refers to all construction activities necessary to install subsurface utilities in accordance with the plans and specifications. Such activities include, but are not limited to: All necessary clearing, grubbing and site preparation; removal of all materials that may interfere with construction activities (except existing pipe work, conduits, utility structures or other items to be left in place) to the lines and grades indicated on the plans and otherwise described herein. The Contractor shall remove all construction trash from the site and transport to a legal disposal site. Removal and/or storage of subsurface materials from trench and construction excavation areas to allow installation of designated utilities or structures. All suitable material removed from excavations shall be used, insofar as practicable, in the formation of embankments, fills and backfilling. Preparation of sub-grades and backfilling of trench and construction areas upon completion of utility or structure construction. All necessary bracing, shoring and protection (but not including tight sheeting in trenches and structure excavation ordered left in place by the Owner or Owner’s Representative). Final grading, dressing and cleanup of the construction site. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |