Similar Projects
Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Well Rehabilitation at Edgar Water Well - WA2202 - City of Richmond
Renovation, Infrastructure
Conception
$331,000 CJ est. value
Richmond, TX 77469

AutoZone #5815 / San Angelo
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
San Angelo, TX 76903

Donnie Mayfield Way Road Improvements
Infrastructure
Design
$3,906,309 CJ est. value
Frisco, TX 75035

FM 723 - Widen Road - Add Lanes
Infrastructure
Bidding
$117,888,849 CJ est. value
Richmond, TX 77406

Beeline Drive Sewer Line Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Harker Heights, TX 76548

Cornerstone Church Phase 2 Community Hall Addition (Sub Bid)
Addition, Demolition, Infrastructure - 69,100 SF
Sub-Bidding
$400,000 CJ est. value
San Antonio, TX 78258

Melissa North Elevated Storage Tank Site Improvements Project
Infrastructure
Post-Bid
Melissa, TX

Grease Traps, Lifts Stations, Septic Tanks, Waste Removal and Related
New Construction, Infrastructure
Post-Bid
El Paso, TX

Sherwood Wastewater Lift Station & Various Upgrades
Results
Cedar Hill, TX 75104

CDBG-Dr Improvements to Lift Stations No. 9 and 10
Results
Less than $244,369 est. value
Rosenberg, TX 77471

K Avenue Lofts
New Construction, Infrastructure
Construction
$88,434,704 CJ est. value
Plano, TX 75074

Raasta
New Construction, Infrastructure - 4,000 SF
Construction
$410,000 CJ est. value
Wylie, TX 75098

107 Pittsburg / Cantex Office
Demolition, Renovation, Infrastructure - 14,501 SF
Pending Verification
$2,500,000 CJ est. value
Dallas, TX 75207

Lake Jackson Apartments Renovation
Renovation, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Lake Jackson, TX 77566

Last Updated 09/22/2022 07:08 PM
Project Title

Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Palo Pinto, TX 76484   (Palo Pinto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The provision and installation of two vertical multi-staged pumps, the provision and installation of an emergency generator with a transfer switch, SCADA system, and associated appurtenances??. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bids. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452 (a)(4) of the Safe Drinking Water Act (42 U.S.C. §300j-12(a)(4), as applicable. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information. This contract is subject to the Environmental Protection Agency’s (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents