Similar Projects
Well No. 11 Replacement
Infrastructure
Bidding
$700,000 est. value
Dyersburg, TN

Submersible Pumps & Equipment
Infrastructure
Bidding
TN

Grinder Pumps
Term Contract
Post-Bid
Crossville, TN

Replace Methane Gas Vents
Alteration
Post-Bid
McMinnville, TN

2021 Well Abandonment
Results
Memphis, TN

Morton HSP Motor and VFD Replacement
Results
Memphis, TN 38128

Raw Water Turbine Pump and Installation
Infrastructure
Post-Bid
Rogersville, TN

Raw Water Intake Pump
Renovation
Results
Spring Hill, TN 37174

Well Pump Inspection and Repair
Infrastructure
Post-Bid
Collierville, TN

Water Well 4
Results
$250,000 est. value
Atwood, TN

3 Stage Vertical Turbine Pump Repair
Infrastructure
Post-Bid
Waverly, TN

2020 CDBG Imminent Threat for Ground Water Well Replacement
Results
$475,000 est. value
Sharon, TN

Vacuum Priming System
Term Contract
Post-Bid
Memphis, TN

2020 Rhea Co CDBG Clearwell
Results
$600,000 est. value
TN

Well & Pump Rehabilitation Sandblasting & Painting
Alteration
Post-Bid
Germantown, TN

Last Updated 02/22/2022 12:56 PM
Project Title

Spiral Lift Pump 204 Rehabilitation

Physical Address View project details and contacts
City, State (County) Charleston, TN 37310   (Bradley County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the removal, recoating, and reinstallation of Spiral Lift Pump No. 204 as well as recoating and grouting of the other spiral lift pumps. Additional scope includes fabrication and installation of metal grate platforms and railing for the 6 spiral lift pumps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents