Similar Projects
2022 Paving Program
Infrastructure
Bidding
Essex, VT

MRGP Improvements - Coon Hill Road and Galvin Hill Road
Post-Bid
Colchester, VT

North Avenue Raised Intersection
Post-Bid
Less than $250,000 est. value
Burlington, VT 05401

Essex BF 5400 (9)
Results
$1,000,000 to $2,500,000 est. value
Essex, VT 05403

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

CY21 Crack-Sealing Program
Infrastructure
Post-Bid
Less than $100,000 est. value
Burlington, VT

Dugway Road Improvements (Huntington Gorge)
Results
$500,000 to $700,000 est. value
Richmond, VT 05477

EAFR Range 6-6 Improvements
Infrastructure
Post-Bid
Jericho, VT

Burlington NH PC21 (1) and Burlington-South Burlington IM 189-3 (77) and Winooski NH PC21 (2)
Results
$1,000,000 to $2,500,000 est. value
Burlington, South Burlington, Winooski, VT

Castle Trail Improvements
Infrastructure
Post-Bid
Jericho, VT

Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Catch Basin Grate and Pavement Repair
Infrastructure
Post-Bid
South Burlington, VT 05403

Shelburne Community School Paving Project
Results
Shelburne, VT 05482

Colchester Causeway Connector Path Construction
Infrastructure
Post-Bid
Colchester, VT

Burlington HES 5000 (18)
Results
$5,000,000 to $10,000,000 est. value
Burlington, VT

Last Updated 04/19/2022 07:44 AM
Project Title

University Place Street Improvements

Physical Address View project details and contacts
City, State (County) Burlington, VT 05408   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of roadway improvements to University Place, including bike lanes, new curbing and sidewalk, and changing traffic flow to one-way along University Place

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents