Similar Projects
Reconstructing Part of Lineville Road Phase 2 - County of Brown
Infrastructure
Conception
$11,400,000 CJ est. value
Green Bay, WI 54301

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

W Mason St, City of Green Bay Const / BRRHB Box Culvert
Infrastructure
Design
$250,000 CJ est. value
De Pere, WI 54115

Perkins Park Ballfield Renovation
Infrastructure
Bidding
$200,000 CJ est. value
Green Bay, WI 54303

New Ashwaubomay Park Storage Facility
New Construction, Infrastructure - 3,200 SF
Bidding
$750,000 CJ est. value
Ashwaubenon, WI 54304

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Resurfacing 2-22 (Including Sewer and Water)
Infrastructure
Post-Bid
Green Bay, WI

2021 Packerland Drive Water Main Loop
Infrastructure
Results
$220,000 est. value
Hobart, WI

Marley Street Utilities Construction
Infrastructure
Results
Howard, WI 54313

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Project Cinco
Addition, New Construction, Infrastructure, Renovation
Pending Verification
$500,000,000 CJ est. value
Green Bay, WI 54304

Coachway Condominiums
New Construction, Infrastructure - 6,160 SF
Design
$30,000,000 CJ est. value
Ashwaubenon, WI 54304

T Ledgeview, CTH MM; CTH G - IH 43
Infrastructure
Bidding
$250,000 CJ est. value
Ledgeview, WI 54311

Last Updated 01/03/2023 12:03 PM
Project Title

WSG 3-22 Water Heater Replacement-Rebid

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54303   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project involves the removal of an existing gas fired water heater, (2) two storage tanks and associated piping. New hot water system will consist of (3) three tankless commercial grade instantaneous water heaters, new expansion tank and thermostatic mixing valve. New water heater venting/air intake systems to be extended to the outer south wall. Piping systems to include cold, hot, hot water return and gas piping. Electrical Trade to provide new electrical outlets for the water heaters and some demolition of existing equipment.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents