Similar Projects
2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

Winnequah Road Bridge Replacement
Results
Monona, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Work
Post-Bid
Verona, WI

Mastic Pavement Repair
Term Contract
Results
WI

Road Repairs
Post-Bid
WI 53572

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

2021 Road Paving
Post-Bid
McFarland, WI

HMA Pavement
Results
WI

2021 Sealcoating
Renovation
Post-Bid
McFarland, WI

Garver Path and Starkweather Drive Assessment
Results
Less than $2,370,000 est. value
Madison, WI 53714

Chip Seal Surfacing and Crack Filling of Town Roads
Post-Bid
Roxbury, WI

Wyoming Avenue, Barr Street and Cliff Street Reconstruction
Renovation
Results
$1,500,000 est. value
Sun Prairie, WI 53590

2021 Road Sealcoating
Post-Bid
Marshall, WI

Last Updated 06/08/2022 12:01 AM
Project Title

A: 3rd Avenue/Monroe Street/pine Street and Maple Street Reconstruction, B: 3rd Avenue Water Service Reconfiguration, C: 4th Avenue Sanitary Sewer

Physical Address View project details and contacts
City, State (County) Fredonia, Madison, Milwaukee, Pittsville, WI 53774 (Dane, Milwaukee, Ozaukee, Wood Counties)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,125,270 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: PROJECT A - 3rd Ave / Monroe St / Pine St and Maple St Reconstruction Utility Construction: Approximately 3,350 lineal feet of PVC water main (6-inch to 10-inch) including valves, hydrants, leads and water services. Approximately 2,400 lineal feet of (8-inch to 10-inch) PVC sanitary sewer including manholes and service laterals. Approximately 3,765 lineal feet of HDPE storm sewer (12-inch to 30-inch) including inlets and manholes. Roadway and Other Associated Work: Approximately 2,920 lineal feet of roadway reconstruction including new SAS fabric, select crushed, underdrain, base course, HMA paving, concrete curb and gutter, sidewalk, and grading. Tree removal, grubbing, excavation, turf restoration. PROJECT B - 3rd Ave Water Service Reconfiguration Water Service Construction: Approximately 50 lineal feet of copper water service (1-inch) including building penetrations and connections to new meters and interior plumbing. PROJECT C - 4th Ave Sanitary Sewer Utility Construction: Approximately 160 lineal feet of (8-inch) PVC sanitary sewer including manholes and service laterals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents