Similar Projects
Deck Overlay, End Post Modification, Rail Retrofit, Approach Slabs, Guardrail, Approach Pavement
Infrastructure
Bidding
$2,000,000 CJ est. value
Menoken, ND 58558

South Dickinson Cemetery
Infrastructure
Bidding
$410,000 CJ est. value
Dickinson, ND 58601

Road Line Painting Services For Town of Williston
Infrastructure
Sub-Bidding
$60,000 CJ est. value
Williston, ND 58801

Gymnasium Floor Covering
Alteration
Post-Bid
Oberon, ND

Class 13 Aggregate and Crushed Concrete
Term Contract
Post-Bid
ND

Bismarck Public Schools Concrete
Alteration
Results
Bismarck, ND 58501

2022 Flood Protection Property Markers
Infrastructure
Results
$25,600 est. value
Grand Forks, ND

ECRWD - Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Thompson, ND 58278

Airfield Pavement Slurry Seal
Infrastructure
Results
$231,443 CJ est. value
Edgeley, ND 58433

Concrete Pavement Repair
Infrastructure
Post-Bid
$800,000 CJ est. value
Wahpeton, ND 58075

Street Improvement District 224
Infrastructure
Results
$2,480,000 est. value
Mandan, ND

Chip Seal
Infrastructure
Post-Bid
$800,000 CJ est. value
Beach, ND 58621

South Washington Street Concrete Bikepath
Infrastructure
Results
$199,285 est. value
Grand Forks, ND 58201

Greenhouse Concrete Replacement
Infrastructure
Post-Bid
$800,000 CJ est. value
Fargo, ND 58102

Water, Sewer, Storm and Street Improvement District No. 2022-11 Cub Creek 2nd Addition
Infrastructure
Results
$16,111,086 CJ est. value
Horace, ND 58047

Last Updated 05/10/2023 11:09 AM
Project Title

Construct Deicing Containment Area

Physical Address View project details and contacts
City, State (County) Williston, ND 58801   (Williams County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Deicing Containment Area for Williston Basin International Airport at Williston, North Dakota. Please download the documents and let Burns & McDonnell know if you have any questions. Technical questions and requests for clarifications shall be submitted in writing only via email to the Engineer, Andy Loftus, no later than 5 calendar days prior to the Bid Opening Date. Questions and clarifications shall be submitted to: aloftus@burnsmcd.com Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner's Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent of the Contractor's surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents