Similar Projects
North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

MUNI - Subdivision - Cherry Hill Estates Fifth Plat - HKIT Architects
New Construction, Infrastructure
Design
Excelsior Springs, MO 64024

Design - Rocky Branch Wastewater Treatment Plant Facility Plan
New Construction, Alteration
Bidding
$350,000 est. value
Kansas City, MO 64165

Rising Hill Elementary School Addition
Addition, Demolition, Renovation, Infrastructure - 11,700 SF
Sub-Bidding
$4,300,000 CJ est. value
Kansas City, MO 64156

McBee's Coffee 'N Carwash / Smithville
New Construction, Infrastructure - 6,502 SF
Sub-Bidding
$1,700,000 CJ est. value
Smithville, MO 64089

Engineering, Planning and Development
Post-Bid

Design and Coordination - Shared Use Path
Post-Bid
North Kansas City, MO

Intersection Improvements
Results
Gladstone, MO 64119

Highway 210 and Walker Road Intersection Improvements
Results
North Kansas City, MO

Tnemec Co. Inc Production and Warehouse
Addition, Demolition, Infrastructure - 310,700 SF
Pending Verification
$33,000,000 CJ est. value
North Kansas City, MO 64116

RFP D/B -Eye Center of Gladstone
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Gladstone, MO 64118

Parks and Recreation/Public Works Facility
Post-Bid
Smithville, MO

2021 Mill and Overlay Program
Results
Gladstone, MO

On-Call Civil Engineering Services
Term Contract
Post-Bid
MO

Last Updated 08/04/2022 09:33 AM
Project Title

RFP Engineering - Linden Connector Trail Design

Physical Address View project details and contacts
City, State (County) Gladstone, MO 64118   (Clay County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Engineering, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Gladstone is requesting qualifications and proposals from professional engineering firms to assist in the design of the Linden Connector Trail from N. Oak Trafficway at NE 69th Street to Missouri Route 1 at NE 68th Street as shown in the attached figure. The City of Gladstone is located north of the Missouri River and encompassed by Kansas City, Missouri (KCMO). The City has a population of approximately 27,000 people spread over 9 square miles. The Linden Connector Trail will provide an important east-west trail connection and will include a combination of on-street facilities, and shared-use concrete trails. The project was awarded $475,000 in Transportation Alternative Funds. The City has $50,000 budgeted for design in FY23 and $700,000 budgeted for construction in FY24. Questions concerning the project should be directed to Tim Nebergall at 816-436- 5442 or email at timn@gladstone.mo.us. This Request for Proposals does not commit the City of Gladstone to award a contract, to pay for any costs incurred in the preparation of the proposal, or to procure of contract the services of supplies. The City reserves the right to accept or reject and or all proposals received as a result of this request, to negotiate with any qualified source, or to cancel, in part or in its entirety, the Request for Proposals if it is in their best interest The method of Contractor Selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents