Similar Projects
Plant Structural Improvements
New Construction
Bidding
$2,500,000 est. value
Modesto, CA 95351

Marin Village Pump Station Improvements
Renovation
Bidding
$2,400,000 est. value
Novato, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Design
Elk Grove, CA 95757

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Ferry Point Sewer Pump Station Improvements
Infrastructure
Bidding
$1,700,000 est. value
Richmond, CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

McFadden Sewer Lift Station Replacement
New Construction
Results
$3,170,000 est. value
Huntington Beach, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Applegate Pump Station Rehabilitation Project
Renovation
Bidding
$750,000 est. value
Atwater, CA 95301

Boathouse Lift Station Replacement Project
Renovation
Results
$300,000 est. value
Fremont, CA 94538

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Pump Station Rejuvenation Services
Renovation
Bidding
Modesto, CA

Last Updated 01/17/2022 02:42 PM
Project Title

E Reservoir Replacement And Pump Station Project

Physical Address View project details and contacts
City, State (County) Vista, CA   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of demolition of the existing 1.5-million gallon E Reservoir structure, construction of a new 2.92-million gallon cast-in-place partially buried reservoir, construction of a new 3,000-gpm booster pump station and associated piping and site improvements.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents