Similar Projects
Last Updated | 01/25/2023 10:09 AM |
Project Title | PVC Fill Media Replacement - Cooling Towers 3 & 4 |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32608 (Alachua County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $89,433 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For PVC Fill Media Replacement - Cooling Towers 3 and 4 1. Removal and disposal of all old PVC Fill Media Materials. 2. Clean Debris from Hot Water Basins, and associated areas where old fill media material was removed. Power wash or clean structure to remove any residual scale or debris where old fill media was in place. 3. Provide and Install PVC Fill Media designed for these cooling towers. 4. Once material and equipment are delivered and work begins, all work must be completed in consecutive days to complete the project in a timely manner. One (1) week of downtime is expected for both cooling towers to be completed and returned to service. 5. All work is to be completed within 10 weeks of PO issuance. 6. One-year materials and labor warranty. 7. All equipment, dumpsters, and materials to be provided by the Contractor/Vendor for the project. 8. Dumpsters and the disposal of all old material will be the responsibility of Contractors/Vendor. 9. Check-in with site Point of Contact Prior to work beginning and upon completion. (Chilled Water Plant Operators OR Kane Powell.) 10. UF will lockout and tagout (LOTO) all necessary valves and electrical components prior to project start, Vendor LOTO is expected on top of UF LOTO until Vendor work is completed. 11. Cover Basin Drains to prevent Debris from entering sumps after all LOTO is complete and prior to starting project. 12. Clean work area at the completion of the project to the satisfaction of the Utilities Chilled Water Department. 13. UF will provide staging areas for equipment, dumpsters, and material to be delivered for project. (2163 Mowry Rd Gainesville, FL 32611) 14. Restroom and 120V outlets available at the facility where work will take place. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |