Similar Projects
Creek Lift Station and Force Main
New Construction
Post-Bid
SD

Lake Norden Main Lift Station Improvements
Results
$575,000 to $600,000 est. value
Lake Norden, SD 57248

Pump Station 203 Improvements
Post-Bid
$2,150,000 est. value
Sioux Falls, SD

Pump Station 218 Improvements - Tuthill
Results
$1,850,000 est. value
Sioux Falls, SD 57105

West Lift Station
New Construction
Results
$330,000 est. value
Elkton, SD

Last Updated 03/19/2021 03:07 PM
Project Title

Mitchell Dailey Drive Lift Station

Physical Address View project details and contacts
City, State (County) Mitchell, SD 57301   (Davison County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,284,738
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and dispose of asphalt surfacing 2. Remove and replace 280 feet of barbed wire fence 3. Remove and replace 680 feet of wood fence 4. Remove and dispose of manhole 5. Rehabilitate existing lift station site and wet well 6. 940 feet of eight-inch sanitary sewer 7. 7,460 feet of six-inch force main 8. Two force main lateral connections 9. 25 force main fittings 10. Five sanitary manholes with 38 VF of total additional depth 11. Four air release manholes 12. 820 feet of 1.25-inch copper water service 13. Lift station wet well and dry pit 14. Automatic stand-by generator system 15. General electrical work 16. Various street repair (97 tons of asphalt) 17. Various base course and gravel surfacing (610 tons) 18. Traffic control 19. Seeding and fertilizing 28,000 square yards 20. All related appurtenances to the aforementioned work

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents