2022 Milling in the 2nd and 3rd Highway Districts
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Philadelphia, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Bidding

Asphalt Pavement Project
Post-Bid
Philadelphia, PA 19141

2021 Milling and Casting Adjustment: 3rd, 5th, and 6th Highway District
Post-Bid
$1,000,000 to $2,000,000 est. value
Philadelphia, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Vision Zero General Construction
Results
Philadelphia, PA

Head Hadley Septa 1000 Ho Exterior Road
Infrastructure
Post-Bid
Philadelphia, PA

Martin Luther King Junior Drive Trail Improvements
Results
Philadelphia, PA 19131

Penndot Superpave Asphalt - 3 Months
Infrastructure
Post-Bid
Philadelphia, PA

Provide Installation And Abandonment Of Natural Gas Main, Services
Results
Philadelphia, PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Emergency Sewer Excavation Repair and Street Restoration
Term Contract
Results
Philadelphia, PA 19102

Navy Yard Street Maintenance
Infrastructure
Post-Bid
Philadelphia, PA 19112

Provide Installation and Abandonment of Natural Gas Main, Services and All Appurtenances and Related Paving
Results
Philadelphia, PA 19019

Reconstruction Of Allegheny, Delaware, And Castor Avenues. Design Build Limited To Ada Ramps
Results
$30,000,000 to $34,999,999 est. value
PA

Last Updated 02/25/2022 02:02 PM
Project Title

2022 Milling and Casting Adjustment Prep in the 1st and 4th Highway District

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

MBE 12% - 15% and WBE 10. This projects scope of work is primarily for full width milling, in advance of city crew paving, for various locations in the 1st & 4th Highway Districts of the City. The contractor will also be responsible to reset manholes and utility boxes as noted in the specifications in accordance with the appropriate utility agencies construction methods and make base repairs as needed. Also, the contractor will be responsible for removal of rubber speed cushions at any of the locations in the attached locations list.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents