Similar Projects
Replace Roofing Systems
Alteration
Results
Less than $2,000,000 est. value
Collinsville, IL 62234

Roof Repair Services
Alteration
Results
IL 62201

Ballasted Roof Replacement at The Family Living Center
Alteration
Post-Bid
East Saint Louis, IL 62205

Health/Life Safety Improvements Partial Roofing Replacement
Results
Swansea, IL 62226

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Bidding
Less than $250,000 est. value

Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Re-Roof Several Schools
Results
Belleville, IL

Roofing Replacement
Alteration
Results
Fairview Heights, IL 62208

Re-Roof Several Schools
Alteration
Bidding
$585,000 est. value
East Saint Louis, IL

Roof Replacement
Post-Bid
Belleville, IL 62220

Health/Life Safety Renovations - Exterior Tuckpointing
Renovation, Infrastructure
Results
Freeburg, IL 62243

Roofing Repair and Maintenance
Post-Bid

Roof Replacement Work at Saint Libory Elementary School
Results
Saint Libory, IL 62282

Roof and Interior Repairs
Results
East Saint Louis, IL 62205

Roof Replacement at Phoenix Court
Alteration
Post-Bid
East Saint Louis, IL 62203

Last Updated 04/19/2022 10:25 AM
Project Title

Roof Replacement and Repairs of Amp 8 Scattered Sites

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of roof replacement and repairs at 11 single family homes within the East St. Louis Housing Authority’s (ESLHA) AMP 8 Scattered Sites properties. The work includes, but is not limited to, removal of the existing asphalt shingles, underlayment, and drip edge flashing; installation of new synthetic roof underlayment; installation of ice dam protection and continuous ridge vents; and installation of new 30-year minimum fiberglass-based asphalt shingles. The bid documents indicate existing trees requiring trimming and pruning, as well replacement of an electrical service weather-head at 1411 Gay Avenue.

Details

Division 01 - General Requirements, Summary, Price and Payment Procedures, Administrative Requirements, Submittal Procedures, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements.
Division 02 - Existing Conditions, Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Roof Specialties.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents