Similar Projects
US 30 Upgrade
Bidding
$10,000,000 to $12,499,999 est. value
PA

2020 Roadway Improvement Program
Bidding
Midland, PA 15059

Asphalt Paving at Nine Building Sites Linmar
Post-Bid
PA

Freedom 7th Street Stabilization
Post-Bid
Beaver, PA

Grand Avenue Roadway Repair
Results
PA

Roadway and Miscellaneous Repairs
Term Contract
Results
Less than $4,000,000 est. value

Liquid Asphalts/Rental Equipment
Bidding
Rochester, PA 15074

Britton Edwards CDBG Street Improvement New Beaver Borough
Post-Bid
New Galilee, PA 16141

Roadway and Miscellaneous Repairs
Term Contract
Results
Less than $5,000,000 est. value

2020 Roadway Improvement Program - Liquid Fuels
Bidding
Beaver Falls, PA 15010

Annual Bituminous Roadway Utility Patching
Post-Bid
Aliquippa, PA

Design Activities are Limited to: Concrete Curb Ramps, Utility Coordination
Results
$5,000,000 to $7,499,999 est. value
PA

Crack and Joint Sealing2020
Bidding
$1,000,000 to $2,499,999 est. value

2019 Roadway Improvement Program - Seal Coating
Post-Bid
PA

Lcsip 2019
Results
$500,000 to $999,999 est. value

Last Updated 03/21/2019 07:29 AM
Project Title

Bituminous Resurfacing

Physical Address View project details and contacts
City, State (County) PA   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provides for milling and paving the Turnpike roadway with superpave wearing course and replacing Sonic Nap Alert Patterns. Work will also include shoulder reconstruction, guide rail end treatment update, guide rail replacement, drainage channel reconstruction, and repairing and replacement of inlets including replacing type A inlets with new inlets, drain pipes and end walls. This contract also provides for bridge repairs which includes Class AA concrete repairs and concrete deck repair and bridge expansion joint system. Additional work includes Homewood maintenance facility mill and overlay, and full-depth bituminous pavement reconstruction at Mileposts 11.8 EB and milling and paving of the Beaver Valley Interchange ramps, MP 12.9. 38,917 Cy Excavation, Class 1, 1a, 1b, 2, & 4 Excavation. 512,867 Sy Milling Of Existing Bituminous Pavement, Various Depths 25,068 Tons Superpave Wearing Course, Pg 64-22, 9.5 Mm Mix, Srl-e 37,831 Tons Superpave Wearing Course, Pg 76-22, 9.5 Mm Mix, Srl-e 15,120 Tons Superpave Binder Course, Pg 64-22, 19 Mm Mix 117 Each Inlet Repairs 49 Each Inlet Replacements 16,073 Lf Type 31-s Guide Rail 4,685 Lf Single Face Concrete Barrier, 52" 2,740 Lf Concrete Glare Screen 96,910 Each Sonic Nap Alert Pattern (Snap) 11,790 Lf Rock Armor 13,197 Cy Rock Armor, Modified 24,315 Lf Compost Filter Sock, 12" & 18" 267,406 Lf Highly Reflectorized Temporary Polyurea Pavement Markings, 4" 228,273 Lf Highly Reflectorized Polyurea Pavement Markings
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents