Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

University Parkway Commercial Center
New Construction, Infrastructure - 13,247 SF
Conception
$3,500,000 est. value
San Bernardino, CA 92405

Willow Springs Road Mixed-Use
New Construction - 80,480 SF
Design
$24,000,000 est. value
Apple Valley, CA 92307

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

RFP D/B - Hydrogen Fueling Station
Infrastructure
Bidding
$6,721,180 CJ est. value
Hesperia, CA 92345

RFP D/B - Hydrogen Fueling Station
Infrastructure
Bidding
$6,721,180 CJ est. value
Hesperia, CA 92345

Fort Irwin Simulation Center
New Construction, Infrastructure - 70,000 SF
Sub-Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts (CL2) #6228 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

CA FTNP MOJA 12(1) Cima Road Project
Infrastructure
Results
$27,227,000 CJ est. value
Cima, CA 92364

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Last Updated 03/22/2023 04:09 PM
Project Title

California Highway Patrol (CHP) Fuel Management System Installation Services

Physical Address View project details and contacts
City, State (County) Rancho Cucamonga, CA 91730   (San Bernardino County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $52,764 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of California Highway Patrol (CHP) is soliciting bids from firms that are able to provide FUEL MANAGEMENT SYSTEM INSTALLATION SERVICES. Bids must address all of the services described in Exhibit A entitled, "Scope of Work" that is included in the Proposed Agreement Forms/Exhibits section of this IFB. Exhibit A contains a detailed description of the services and work to be performed as a result of this IFB including those terms in the referenced exhibits. 1. License Requirement: General A (General Engineering) with a Hazardous Substance Removal Certification (HAZ) 2. DIR Registration: Bidders must be registered with the DIR Pursuant to California Labor Code Sections 1770, 1773 and 1773.1. 3. Prevailing Wage Rates Apply. 4. Mandatory DBVE Participation California Law Requires Disabled Veterans Business Enterprise (DVBE) participation. All bidders for this solicitation, must meet the minimum DVBE participation requirement of 5%. Bidders are eligible to receive a DVBE incentive for their participation. For more information regarding this option, see section M of the IFB entitled "Preference and Incentive Programs. The term of the resulting agreement is expected to be effective from March 1, 2023 through November 30, 2023. The agreement term may change if CHP makes an award earlier than expected or if CHP cannot execute the agreement in a timely manner due to unforeseen delays. CHP reserves the right to extend the term of the resulting agreement as necessary to complete or continue the services. Agreement extensions are subject to satisfactory performance, funding availability, and possibly approval by Department of General Services (DGS). The resulting agreement will be of no force or effect until it is signed by both parties and approved by DGS, if required. Bidder is hereby advised not to commence performance until all approvals have been obtained. If performance commences before all approvals are obtained, said services may be considered to have been volunteered. Bidders shall submit questions via email to Sridharan Krishnamurthy at Sridharan.Krishnamurthy@chp.ca.gov Questions Due January 20, 2023 at 4:00 p.m.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents