Similar Projects
US 69 - Intersection Improvement
Infrastructure
Bidding
$394,308 est. value
Tyler, TX 75713

2021 Seal Coat Project
Post-Bid
Tyler, TX

Donna, Melinda, and Mirabeau Street Improvements
Post-Bid
$1,530,000 est. value
Tyler, TX 75702

Hawk Light Sidewalk Project Phase 1
Results
$473,500 est. value
Tyler, TX 75799

Annual Contract for Surface Treatment
Term Contract
Results
Less than $500,000 est. value
TX

Springhill Suites
New Construction - 64,000 SF
Construction
$7,500,000 est. value
Lindale, TX 75771

2021 CDBG Sidewalk Improvements
Infrastructure
Post-Bid
Tyler, TX

Surfacing/Roadway Restoration
Results
$19,771,674 est. value
TX

Road Improvements to CR 366 and CR 369
Infrastructure
Post-Bid
$1,600,000 est. value
Tyler, TX 75702

Widen Road - Add Shoulders
Results
$1,394,049 est. value
TX

Road Improvements to CR 422
Infrastructure
Post-Bid
$1,130,000 est. value
Tyler, TX 75702

IH-20 Total Maintenance
Results
$5,044,222 est. value
TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Hot Mix
Results
$264,600 est. value
TX

2022 Asphalt Crack Seal Project
Infrastructure
Post-Bid
Tyler, TX

Reported 06/13/2022 02:38 PM
Project Title

Structural Repairs for Building B200 / Holiday Inn Club Vacations

Physical Address View project details and contacts
City, State (County) Flint, TX 75762   (Smith County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected October 2022, Construction Completion Expected March 2023
Bids Due View project details and contacts
Estimated Value Less than $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Replace damage to structural components including walkways, stairs, balconies, floor trusses etc. As of June 2022, information regarding general contractor selection has not been disclosed. Construction is expected to begin in the fall of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Hotel/Motel, Approximately 7,626 SF Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents