Similar Projects
Installation of (1) 60" Aluminum Awning with LED Lighting
Post-Bid
Dallas, TX 75202

Replacement of Fascia, Soffit, Wood Trim and Exterior Paint at Roseland Estates
Post-Bid
TX 75204

Annual Bid for Screening Wall Repair and Maintenance
Term Contract
Results
$150,000 est. value
Rowlett, TX

Terminals A, B, C, & E Waterproofing
Results
$7,986,962 est. value
Dallas, TX 75261

Skylink Structural Repairs - Column Drains
Alteration
Results
$2,798,856 est. value
Dallas, TX

Design-Build of the Dynamic Glass at Terminal D
Results
$6,300,000 to $8,300,000 est. value
Dallas, TX 75261

Inspection and Repair of Flag Poles at City of Irving Facilities
Term Contract
Post-Bid
Irving, TX

Replacement of Fascia, Soffit, Wood Trim, and Exterior Paint at Monarch Townhomes
Post-Bid
Dallas, TX 75204

Replace Greenhouse Shutters
Results
Less than $24,373 est. value
Dallas, TX 75252

Replacement of Fascia, Soffit, Wood Trim and Exterior Paint at Carroll Townhomes
Post-Bid
Dallas, TX 75204

East Entrance Barrel Vault Repairs for Irving Arts Center
Alteration
Post-Bid
Irving, TX 75062

Maintenance, Repair, & Restoration of Outdoor Waterslides and Aquatic Features
Term Contract
Post-Bid
Dallas, TX 75201

UNTD College of Law Leak Remediation
Results
Dallas, TX 75201

West Irving Library Exterior Slab Replacement
Results
$205,000 est. value
Irving, TX 75060

Restoration of Amusement Water Slides
Term Contract
Results
Irving, TX 75063

Reported 08/26/2021 12:00 AM
Project Title

Handrail Installation at King Square Park

Physical Address View project details and contacts
City, State (County) Irving, TX 75060   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Furnish materials and labor to fabricate and install approximately 82’ of handicap ramp railing and 22’ of step rails. 2. Rails will be fabricated from 1 ¼” Sch. 40 pipe (1.6250). 3. Top rail shall be set to maintain 36” above finished floor (AFF). 4. Bottom rail shall be set to maintain 4” clear space AFF. 5. Rails shall be continuous and have 12” ADA compliant extensions. 6. All welding shall be ground smooth with an architectural finish. 7. Rails shall be sandblasted, and powder coated semi-gloss black. • Posts shall be core drilled into existing concrete and filled with quick set 5000# joint filler compound POR-ROK or approved equal.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents