Similar Projects
Site Improvements for the Green Street Recreational Complex Expansion
Addition, Demolition, Infrastructure
Bidding
$600,000 CJ est. value
Marion, SC 29571

Site Improvements for the Green Street Recreational Complex Expansion
Addition, Demolition, Infrastructure
Bidding
$600,000 CJ est. value
Marion, SC 29571

Mullins Tennis Court Renovations
Renovation
Post-Bid
Mullins, SC 29574

Sidewalks
Infrastructure
Post-Bid
Mullins, SC

Marion County Airport Storm Drainage Rehabilitation
Results
SC

Rehabilitation
Infrastructure
Results

Marion Area Schools Re-Surfacing Package
Infrastructure
Post-Bid
$300,000 est. value
Marion, Mullins, SC 29571

Wilcox Avenue Asphalt Resurfacing Project
Infrastructure
Results
Marion, SC 29571

James Street Resurfacing 1
Infrastructure
Post-Bid
$1,200,000 est. value
Mullins, SC 29574

Preservation - District 5
Infrastructure
Results

James Street Resurfacing 2
Infrastructure
Post-Bid
$1,200,000 est. value
Mullins, SC 29574

Henry Mcgill Street Asphalt Resurfacing Project
Infrastructure
Results
Marion, SC 29571

Safety Improvements- District 5
Infrastructure
Results

Reconstruction/Rehabilitation
Infrastructure
Results

Asphalt Sealing Services
Infrastructure
Results
Conway, Marion, SC 29528

Last Updated 08/05/2022 02:03 PM
Project Title

Recreational Complex - Green Street

Physical Address View project details and contacts
City, State (County) Marion, SC 29571   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: The proposed improvements for The City of Marion Recreational Complex Expansion will consist of construction site improvements including, but not limited to site clearing, grading, and construction of site consisting of two (2) GABC parking lots (+/- 5,550-SY) for events, one (1) football field, two (2) soccer fields, access sidewalks and bleacher pads, one (1) 1,000 SF playground area, and an eight (8)-foot wide half (0.5)-mile wood mulched loop walking trail. Base Bid Alternate 1 - Pavement and Striping: The proposed improvements will include approximately 2,475 SY of 2-inch Asphalt Surface (Type C), 2,900 SY LF of 3-inch Asphalt Surface (Type C), and Striping of parking spaces and directional signage. Base Bid Alternate 2 - Irrigation System: The proposed improvements will include the site irrigation systems for the two (2) soccer fields, one (1) football field, and the surrounding grassed and landscaped areas within the site and the electrical control system. Base Bid Alternate 3 - Walking Trail: The proposed improvements will include an 8-foot wide by 3-inch thick Mulch Trail around the perimeter of the site. NOTICE TO BIDDERS: Each bidder shall fully acquaint himself with the conditions relating to the scope and restrictions attending the execution of the work under the conditions of this Bid. The failure or omission of a bidder to acquaint himself with existing conditions shall in no way relieve him of any obligation with respect to this Bid or to the contract. All amendments to and interpretations of this solicitation shall be in writing and issued by Alliance Consulting Engineers, Inc. City of Marion or Alliance Consulting Engineers, Inc. shall not be legally bound by any amendment or interpretation that is not in writing. Award of the project is contingent on funding approval by the City of Marion Council and will be based on the total cost of the base bid scope of work. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. Contractors shall have a proper and active South Carolina License Classification to complete this project. No bid may be withdrawn within a period of sixty (60) days after the actual date of the opening and thereof The Owner reserves the right to waive any informalities or to reject any or all bids. Construction Cost Range:$1,000,000 to $1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents