Similar Projects
Geiser Road Ditch Drainage Improvements
Post-Bid
Less than $179,155 est. value
Holland, OH

Professional Design Construction Services for the Harroun Park River Trail Bioretention and Stream Restoration project
Post-Bid
Sylvania, OH

SAJRD Woodrow Child Care Center Improvement
Results
Sylvania, OH 43560

Drainage Install/Grade at Scott Park
Results
Less than $84,970 est. value
Toledo, OH

Jacking and Boring Services
Post-Bid

Metzger Marsh Roadway Embankment Stabilization Project
Results
Less than $936,500 est. value
OH

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

South River Road Drainage Improvement
Results
Less than $238,552 est. value
Toledo, OH 43604

Sewer and Water Kills - City
Term Contract
Results
Toledo, OH

Sewer and Water Kills - Land Bank
Term Contract
Results
Toledo, OH

Box Culverts
Results

Concrete Pipes
Results

Silver Creek Phase 3 Improvements
Results
Less than $1,075,000 est. value
Toledo, OH

Delaware Creek Restoration - Construction Phase
Results
Less than $225,384 est. value
Toledo, OH

J Cunningham Ditch Drainage Improvements
Results
Less than $224,707 est. value
Holland, OH

Last Updated 01/09/2020 08:03 AM
Project Title

Urban Runoff Capture and Otter Creek Restoration Project

Physical Address View project details and contacts
City, State (County) Oregon, OH 43616   (Lucas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $696,483
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a stormwater treatment system, storm sewer, parking area, and associated restoration in the Eastmoreland and Euclid Park subdivisions of the City of Oregon. Storm sewer construction on Eastvale Avenue will include an estimated 1,312 linear feet of 21" storm sewer and an estimated 563 linear feet of 18" storm sewer. Excavation and grading for the stormwater treatment system will include the creation of a 0.5 acre forebay and various wetland features by excavation and grading. A total basin volume of 124,273 cubic feet will be created. Landscaping includes the installation ofwetland plugs, trees, shrubs, and various floodplain and upland seed mixes, as well as invasive species control.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents