Similar Projects
Castle Trail Improvements
Infrastructure
Post-Bid
Jericho, VT

2020 Sidewalk Spot Repairs
Results
Colchester, VT

TAP TA15(4) - Sidewalk
Results
Essex, VT

Trail Construction Adjacent to State Park Road
Results
Charlotte, VT

Hinesburg Community School Parking and Sidewalk Improvements
Results
Hinesburg, VT 05461

Cherry Street Sidewalk STP SDWK(18)
Results
Less than $300,000 est. value
Milton, VT

Burlington Greenway Construction Phase 3B North: Blanchard Beach to Proctor Place
Results
$100,000 to $300,000 est. value
Burlington, VT

CEATS Building 119 Parking Improvements
Results
Jericho, VT 05465

Colchester-Essex NH 030-1 (34)
Results
$1,000,000 to $2,500,000 est. value
Colchester, Essex, VT 05439

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Shelburne Community School Paving Project
Results
Shelburne, VT 05482

Allen Road Shared-Use Path
Results
South Burlington, VT 05403

Greenway Rehabilitation Phase 3B South Construction
Results
$750,000 to $1,000,000 est. value
Burlington, VT 05401

Schmanska Park Pathways Construction
Infrastructure
Results
$40,790 est. value
Burlington, VT 05401

Reported 10/21/2021 12:00 AM
Project Title

Colchester Causeway Connector Path Construction

Physical Address View project details and contacts
City, State (County) Colchester, VT   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 09/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work including approximately 230 feet of providing fabric and new gravel subbase, compacting, and paving (matching design grades, using 2” of pavement, 8’ wide), approximately 130 feet of fine grading, compacting and paving (using 2” of pavement, 8’ wide), and approximately 4690 feet of grading and compacting the existing trail surface, installing 3” of compact crusher dust, re-establishing consistent 8’ width, and fine grading and compacting the new surface to Mills Point Road. Approximately 5,050 total linear feet of path repairs are included in the project. The Airport Park Parking Area can be used for the construction staging area, but it must be restored to its original condition upon completion of the project. All work to be performed for the Colchester Causeway Connector Path Project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents