Similar Projects
Cates Bay D & L
New Construction
Conception
Conway, SC 29526

Lambert Tract
New Construction
Conception
Aynor, SC 29511

Riverland Oaks
New Construction
Design
James Island, SC

Graham Village - Infrastructure
New Construction
Design
Little River, SC 29566

10 St. Margaret Street Landscaping and Site Improvements
Bidding
Charleston, SC 29401

I-26 Phase II Clear Zone Improvements
Bidding

Family Health Centers
New Construction, Renovation, Addition - 33,876 SF
Post-Bid
Orangeburg, SC 29115

Weathers Commercial - Site Work
New Construction
Post-Bid
Summerville, SC 29483

Hugh K. Leatherman, Sr. Terminal - Site Grading Project
Results
North Charleston, SC 29405

Site Development Improvements
Results
Bluffton, SC

LandTech Subdivision - Infrastructure
New Construction
Construction
Blythewood, SC

Luxury Rv Park
New Construction
Construction
Bluffton, SC

Bradford Meadows - Infrastructure
New Construction
Conception
Sumter, SC 29153

Clemson Cottages
New Construction
Design
Clemson, SC 29631

Greenville-Spartanburg International Airport (GSP) GA Development Phase 1A
Bidding
Spartanburg, SC 29301

Last Updated 02/12/2019 01:32 PM
Project Title

Stoney Field Improvements - Phase 1 Early Surcharge Package

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Surcharge program to consolidate the existing Stoney Field located off Fishburne Street in the City of Charleston. The project will be completed in two phases. Phase 1 will include placement of erosion control measures, limited demolition of site items, installation of approximately 150,000 SF of permeable low strength geotextile fabric within the surcharge limits, installation of a 12” thick drainage layer approximately 5,500 compacted cubic yards consisting of clean sand less than 5% fines passing the #200 sieve, installation of approximately 7,250 prefabricated vertical drains, placement of an additional 24,500 compacted cubic yards of clean sand less than 5% fines passing the #200 sieve, and final site stabilization. Soil monitoring equipment and installation will be provided by others; however, the selected contractor will be required to coordinate their work with the placement of the monitoring equipment.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents