Project Title

Supplying and Installing a Stand-By Generator for Fire Station 3

Physical Address View project details and contacts
City, State (County) Derry, NH   (Rockingham County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Remove and dispose existing 45 kW generator. 2. Remove existing fuel lines, pump and cap-off as required. 3. Remove existing generator pad and install new generator pad that meets building Code clearance from building. Pad must be a minimum of 8 inches thick 3000 PSI concrete and must extend 6 inches beyond the limits of the generator in all directions. Work will include excavation to remove organic material and placement of a minimum of 6 inches of 1 1/2 inch crushed gravel below the pad. 4. Provide generator grounding as required. 5. Rework existing U.G. conduits /conductors from existing Kohler ATS to new generator location. Include additional U.G. conduits /conductors for alarm, control and annunciator circuits. Replace wire and conduit to main service disconnect. 6. Install new generator remote annunciator - location to be confirmed by owner. 7. Install new 51kW generator at new pad location - this will require a crane to set it behind the building. 8. Provide 10 gallons diesel fuel for generator start-up /commissioning /owner training with manufacture Rep.
Details
Division 26 - Electrical, Packaged Generator Assemblies.