Last Updated | 01/29/2019 09:09 AM |
Project Title | Supplying and Installing a Stand-By Generator for Fire Station 3 |
Physical Address | View project details and contacts |
City, State (County) | Derry, NH (Rockingham County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove and dispose existing 45 kW generator. 2. Remove existing fuel lines, pump and cap-off as required. 3. Remove existing generator pad and install new generator pad that meets building Code clearance from building. Pad must be a minimum of 8 inches thick 3000 PSI concrete and must extend 6 inches beyond the limits of the generator in all directions. Work will include excavation to remove organic material and placement of a minimum of 6 inches of 1 1/2 inch crushed gravel below the pad. 4. Provide generator grounding as required. 5. Rework existing U.G. conduits /conductors from existing Kohler ATS to new generator location. Include additional U.G. conduits /conductors for alarm, control and annunciator circuits. Replace wire and conduit to main service disconnect. 6. Install new generator remote annunciator - location to be confirmed by owner. 7. Install new 51kW generator at new pad location - this will require a crane to set it behind the building. 8. Provide 10 gallons diesel fuel for generator start-up /commissioning /owner training with manufacture Rep. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |