Reported 04/23/2021 12:00 AM
Project Title

Ludington Ditch, Arm 19- Drain Tile Reconstruction, Phase 1

Physical Address View project details and contacts
City, State (County) Valparaiso, IN   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located near the intersection of CR 100 W and CR 450 S and generally extends from just north of CR 450 S north to the confluence with Ludington Ditch, Arm 16. The project is located in Section 27, Township 34 North, Range 6 West, in Porter Township, Porter County, Indiana. The project consists of the installation of a new drain tile system to replace a failed drain tile system that includes the downstream end of Ludington Ditch, Arm 19. The overall purpose of the project is to enhance the drainage and storm water management services provided to the surrounding property owners by improving the area's storm water infrastructure. It generally includes the installation of drain tile, via open trench construction and the installation of storm sewer structures. The project also includes other items incidental to the work including the creation and maintenance of temporary construction entrances and construction access routes, and the construction of a grassed waterway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents