Similar Projects
Last Updated | 11/18/2022 01:05 PM |
Project Title | Phase IV Cemetery Improvements Northern Wisconsin Veterans Memorial Cemetery |
Physical Address | View project details and contacts |
City, State (County) | Spooner, WI 54801 (Washburn County) |
Category(s) | Heavy and Highway, Religious/Funeral |
Sub-Category(s) | Funeral Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,695,541 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work consists of redevelopment of existing Section D into in-ground cremain burial, create a new columbarium walls and plaza for interments, extends roadways to serve new cemetery areas, grading, landscape enhancements, irrigation, storm sewer and improves drainage in the area of the expansion. This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Base Bid will be received for: A single lump sum bid for All Work.Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |