Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Sterling State Park - Heritage Trail Improvements
Infrastructure
Bidding
$230,000 CJ est. value
Monroe, MI 48162

Sterling State Park - Heritage Trail Improvements
Infrastructure
Bidding
$230,000 CJ est. value
Monroe, MI 48162

Paving & Site Lighting
Post-Bid

Water System Water Main Improvements
Post-Bid
Temperance, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pine Ridge Water Main Extension
Results
Carleton, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Calumet-Swedetown Trail Capping, And Route Grading
Results

2021 Dundee Road Maintenance
Infrastructure
Post-Bid
Dundee, MI 48131

10.20 MI of Concrete Pavement Repairs
Results
MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Last Updated 08/05/2022 04:33 PM
Project Title

La-Z-Boy Site Redevelopment Phase 2

Physical Address View project details and contacts
City, State (County) Monroe, MI 48162   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall consist of installation of roadway and utilities, retention pond construction, culvert crossing of Mason Run Drain, all as required to facilitate extension of Huber Drive across the project site, and other related work. Bidders for any Construction Project whose bid is valued at greater than $175,000 in total, and subcontractors of any tier that intend to perform work valued at over $50,000.00 shall be determined to be a "Responsible Bidder" in accordance with the City's Purchasing and Contracts ordinance prior to award, and must submit a Responsible Bidder Prequalification Package with their bid. Details on the entirety of this process are contained in Division D of the contract, and required forms are included in the Appendix to the contract. As this is the first year of contracts let with these requirements, the 10-day advance requirement will be waived and information may be submitted any time prior to, or with, the bid submission. The City of Monroe reserves the right to accept any proposal, to reject any proposal or to waive defects in proposals. A bid bond or certified check made payable to the City of Monroe in the amount of not less than five percent (5%) of the bid must be posted by each bidder with his / her bid. No bidder may withdraw his bid within SIXTY (60) days after the actual date of the opening thereof, but may withdraw it at any time prior to the scheduled closing time for receipts of bids. General Requirements - Bid Deposit Required - Insurance Required - Prevailing Wage Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 05/27/2022 04:30 PM EDT Questions are submitted online No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents