Similar Projects
Last Updated | 08/16/2023 01:00 PM |
Project Title | RFQ Contractor - Biosolids Digester Facilities - T-31.06 Shoring Demolition |
Physical Address | View project details and contacts |
City, State (County) | San Francisco, CA 94103 (San Francisco County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $60,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Document is a legal notice informing all Applicants of MWH Constructors & Webcor Builders, A Construction Joint Venture (hereafter referred to as MWH/Webcor) intent to solicit and receive Statements of Qualifications with the purpose of prequalifying Bidders to submit proposals to perform Work on specific Bid Package listed in this advertisement for the WW-647R Biosolids Digester Facilities Project. This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works. Trade Contractor to perform demolition, off-haul and disposal of top section and localized deeper sections ( to accommodate installation of permanent work) of the Diaphragm wall and Cutter-Soil Mix (CSM) shoring walls in Facilities 610, 600, 615, 661 and Tunnel H for the Biosolids Digester Facilities Project (BDFP). Scope of work also includes demolition of min. 6 inches wide strip through the CSM shoring walls at seismic joint locations by Line-Drilling method. The shoring walls for the mentioned structures were furnished and installed by the T31.01 Trade Contractor, Malcolm Drilling Co. Inc. The Engineer of Record for these shoring walls is Brierley Associates, appointed by Malcolm Drilling to perform all engineering and monitoring of the overall shoring system. Applicants who pre-qualify as Bidders are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (WIFIA), also administered by the US EPA Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are projectwide participation goals that the Contractor may seek to meet: 1. 5.6% MBE 2. 1.2% WBE The project wide requirement for Local Business Enterprise participation is 12% of the Contract Sum. The Local Hiring requirement for the Construction Phase of the Project is 30% laborers and 50% for apprentices for each trade. In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Bidder without proof that the Bidder and all identified subcontractors are currently registered with the California Department of Industrial Relations. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |