Similar Projects
Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 126 Resurfacing, Undivided System
Infrastructure
Design
$2,800,315 CJ est. value
Hamilton, OH 45013

Greenup Spare Draft Tube Gate Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Hamilton, OH 45011

Resurfacing
Infrastructure
Bidding
$301,943 CJ est. value
Trenton, OH 45067

Shannon Ridge - Cherokee Park Pedestrian Path
Renovation, Infrastructure
Post-Bid
$82,282 est. value
OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Edgewood School Tennis Courts
New Construction
Results
Less than $350,000 est. value
Trenton, OH 45067

Harbin Park 8 Pickleball Courts
Renovation
Results
$85,000 est. value
Fairfield, OH 45014

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 589,500 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 589,500 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

GMR Trail Monroe - Bike Facility
Infrastructure
Design
$2,279,070 CJ est. value
Monroe, OH 45050

Reily Township Walk Path
Infrastructure
Bidding
$71,063 CJ est. value
Reily Township, OH 45056

Community Dev Village of Seven Mile Emergency Storm Sewer Replacement
Infrastructure
Post-Bid
$97,798 CJ est. value
Hamilton, OH 45011

Harbin Park Overlook Renovation
Renovation
Results
$534,128 est. value
Fairfield, OH 45014

Last Updated 08/30/2022 10:08 AM
Project Title

Forest Run Metropark - Timberman Ridge Enhancements

Physical Address View project details and contacts
City, State (County) Hamilton, OH 45013   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $212,223 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 30, 2022, project is on hold. No definite date for the rebid. Base Bid $212,223 Add Alternate #1 $11,925 Forest Run Metropark - Timberman Ridge Enhancements Bidders should address all questions in writing via email to Matt Latham, Park Planner/Project Manager, mlatham@yourmetroparks.net. All questions are due no later than 3:00 P.M. on August 1, 2022. Each Bidder is required to furnish with its Bid a Bid Guaranty in accordance with Section 153.54 of the Ohio Revised Code. Such Bid Guaranty shall be in the form of either a bond, secured by a corporate surety, in the amount of 100% of the bid amount; or a certified check, cashier's check, or irrevocable letter of credit, made payable to MetroParks of Butler County, in an amount equal to 10% of the Bid amount. All corporate sureties shall be licensed in the State of Ohio to provide said surety. Each Bid must contain the full name of the party or parties submitting the Bid and all persons interested therein. Successful bidders shall comply with all applicable federal and state laws and regulations pertaining to equal employment opportunities. This is a prevailing wage project. MetroParks of Butler County is a government agency exempt from all local, state and federal taxes. Bids must be submitted in sealed envelopes and clearly marked with the Bid No., project title, and the designation of the contract being bid upon. No bid may be withdrawn before sixty (60) days have elapsed after the Bid Opening Date. The Board of Park Commissioners intends to award a contract to the lowest and best bidder whose Bid is submitted in accordance with the requirements of these bidding documents and does not exceed the funds available for the Project. The project is described as follows: Installation of prefabricated restroom (provided by others), grading, concrete work, utilities, and associated site improvements. No contract will be awarded if the lowest and best bid is in excess of 10% above the Engineer's pre-bid estimate of cost, which is published in the Contract Documents The Board of MetroParks Commissioners reserves the right to reject any or all bids and to waive any nonmaterial irregularities in the bidding

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents