Similar Projects
Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Sewer Rehab of Bode Lift Station
Results
Schaumburg, IL 60193

Replace Pump 5 and Install Two VFD's for Pump 11 and Pump 12
Results
Niles, IL 60714

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Post 4 Lift Station Improvements
Results
Less than $533,904 est. value
Tinley Park, IL 60477

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Six Shafts Infiltration Mitigation
Term Contract
Results
$1,874,000 to $2,269,000 est. value
Hodgkins, IL 60525

Hicks and Dundee Monopole
Renovation
Post-Bid
Arlington Heights, IL

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Cottonwood Relief Station Rehabilitation
Results
Mount Prospect, IL

Harlem Avenue Lift Station Improvements
Results
Chicago Ridge, IL 60415

107th Street Pump Station Improvements
New Construction
Results
Chicago Ridge, IL 60415

Terrace Court Stormwater Pump Station Improvements
Renovation
Results
Glencoe, IL

Rehabilitation of Raw Sewage Pump Rotating Assemblies at Various Locations
Renovation
Results
$1,530,000 est. value
Chicago, IL

Reported 02/16/2022 12:00 AM
Project Title

Menominee Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Palos Heights, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The lift station work includes a new wet well structure, submersible pumps and lifting system, sanitary piping, valve and equipment fiberglass enclosure, and electrical control components, natural gas emergency generator, approximately 800 linear feet of horizontally drilled 6” sanitary force main, asphalt driveway, protective lining of existing sanitary manhole, abandonment of existing pumping station and piping, and other related work.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents