Similar Projects
Woodfield Area Apartments
New Construction, Addition
Conception
$90,000,000 est. value
Schaumburg, IL 60168

Ridge Avenue Multi-Family
New Construction - 97,072 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Evanston, IL 60201

Tribune Tower East
New Construction - 2,000,000 SF
Design
$700,000,000 est. value
Chicago, IL 60611

Harrison Street Parking Structure
Renovation
Bidding
Chicago, IL 60607

Garage Addition and Concrete Work
Addition
Bidding
Arlington Heights, IL 60005

Apartment Complex
New Construction
Sub-Bidding
Darien, IL 60561

Lincoln Station Row House Apartments
New Construction - 117,816 SF
Post-Bid
New Lenox, IL 60451

Addison Avenue Parking Structure Maintenance Repairs
Post-Bid
Elmhurst, IL

Parking Structure-2020 Maintenance Repairs
Results
Des Plaines, IL 60016

Parking Structures 2020 Maintenance Repair
Results
Bloomington, IL 61701

River Lofts of Saint Charles
New Construction
Construction
$4,500,000 est. value
Saint Charles, IL 60174

CDH Winfield Town Center Planned Unit Development
New Construction - 23,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Winfield, IL 60190

The Point at Six Corners
New Construction - 66,800 SF
Pending Verification
$130,000,000 est. value
Chicago, IL 60611

Cassidy Place Mixed Use
New Construction
Pending Verification
$139,000,000 est. value
Chicago, IL 60654

One North Washington Multi Family Parking Garage and Retail
New Construction - 17,530 SF
Design
$40,000,000 to $50,000,000 est. value
Batavia, IL 60510

Last Updated 04/05/2021 05:13 PM
Project Title

Parking - Central Campus Parking Structures - Bid Package 1

Physical Address View project details and contacts
City, State (County) Urbana, IL   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Division 01 - General Work 02 - Plumbing Work 04 - Ventilation Work 05 - Electrical Work Restoration of Parking Structures C7 and C10 by Overhaul of mechanical, electrical, and plumbing systems and components (C7) only, installation of a new 150kW emergency power generator and concrete with brick veneer wall enclosure, trenching new electrical conduit lines, installation of fencing at the roof level, abandonment of existing slab PT tendon reinforcement repairs, recoating ther existing traffic bearing waterproofing membrane, facade repairs - pinning, masonry replacement/rebuilding, tuckpointing, joint sealant replacement of coping stones, installation of thru-wall flashing, partial replacement of storefront, and roofing replacement.

Details

2 Parking Garage, 90,000 SF Renovation SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Fire Protection Specialties.
Division 14 - Conveying Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents